You do not need a finished script to start a conversation. Knowing who the film is for, where it will be seen and what you want it to achieve gives the team a useful place to begin.
Can we talk before we have a script?
Absolutely. Share a short introduction to your brand or event, your audience, intended use and deadline. If you have reference films, tell us what you respond to: the pace, colour, interview style or overall feeling.
References help set a direction. Being specific about the feeling you want makes it easier to find an approach that fits your own brand.
What shapes a production budget?
Creative development, shoot days, locations, crew, equipment, cast, animation and post-production all affect the cost. Two films of the same length can require very different resources.
A budget range helps us prioritise the most valuable shots and versions. Agree on voiceover, subtitles, music, revisions and source-file delivery when discussing the scope.
Does a longer film tell a better story?
Running time should follow the audience and setting. An exhibition loop, a website introduction and a social film serve different viewing habits. Start with one central message, then plan the main film and shorter edits around it.
How long will production take?
Locations, contributors, event schedules, travel and post-production complexity determine the timetable. After filming, footage still needs organising, editing, subtitles, colour and sound work.
If you have a launch date, work backwards from it and allow time for internal review and final approval. The actual schedule is agreed for each project.
When should we request vertical and short versions?
During planning. Aspect ratios affect framing, positioning and subtitles; a vertical edit may also need a different rhythm. List the intended channels early so we can capture the coverage each version needs.
What should we agree on before delivery?
Confirm the number of films, resolution, aspect ratios, subtitle languages, revision rounds and whether source footage or project files are included. Different deliverables involve different preparation.
Ask one contact to consolidate review notes with timecodes and reasons for each change. Clear feedback keeps the versions and the conversation manageable.